Yesterday (11/21/26) I was honored to receive a copy of a collections of “Sea Stories, Memories and Antidotes – But Mostly Sea Stories of a Submarine Career” by MMCS(SS) Al Keyser. These are the kinds of stories and memories that are so imperative to us as a community to collect, share and retain as a part of institutional memory and as a means to carry out our mission as defined in the USSVI Creed.
I present a small portion of the collection here, focused on November 1976…
-Dave Bowman, USSVI National Historian
Silverdale, WA
By Al Keyser
Panama

SUBLANT’s tiger team of HTs and MRs were on the pier when we arrived in Rodman. Reason for them being sent was that SUBLANT didn’t want to rely on the makeshift rudder repair for the canal transit.
Tiger Team guys were impressed with our makeshift repair. I was never sure if they were impressed with our ingenuity, or that it actually worked. Probably a bit of both. I was assigned to assist the tiger team as needed. We tagged out the rudder and removed our temporary repair. They cut off the rudder fitting, put on the aluminum block from the anchor and then welded the fitting back on that they cut off. When finished, we could not hydro the repair. Best we could do was apply system pressure and cycle the rudder a few times. We got done about 2 hrs before the maneuvering watch being set for the canal transit.
Canal Transit

After the anchor fiasco in Rio, losing the anchor in Santiago and the rudder issue leaving Lima, we felt the South American circumnavigation could not get any worse. We were hoping for an incident free canal transit. Why we would think that, I have no idea, cause it was not to be.
Set the maneuvering watch, pilot comes on board. Underway. Homeward bound! I’m in crews mess for the transit, so most of this incident was told to me.
We move into the queue to transit the canal, waiting for the first lock to open. When open, we are given permission to enter. Pilot, who is used to moving a merchant, orders ahead full. Helm answers, ahead full. Throttleman answers, ahead full. Probably takes several miles for a merchant to reach ahead full. When you ask for Ahead Full on a 594 SSN (as the pilot soon learned), from a dead stop, you pretty much get Ahead Full, like right now.
Guys topside said we shot forward. Heading straight for the wall of the lock. CO orders All Stop, Back full, Back Emergency. Pretty much as fast as you can read it, but not fast enough. We smacked the lock wall with our Starboard side. Those of us on the mess decks, that was the first we knew of a problem. We hit hard. Boat rocked back and forth pretty good. As we hit CO ordered All Stop. But, between the collision with the lock wall and the backing bell, the bow swung around and hit the other side of the lock with our port side, but luckily, not as hard.
No collision alarm, no 1 MC announcement, nothing over the phones. No one not in Control or topside had any idea what happened. What did we hit? Anyone hurt? Whats damaged and how bad. CO, Pilot and topside get us settled in the lock. Initial assessment is no problems, no one injured. We continue. Lock is flooded, and we get connected to the mules (actually little electric train engines, called mules, a carryover because originally, ships were maneuvered with real mules) to get pulled through the remaining locks.
We get through the remaining Pacific side locks. Manage to complete the transit of the “Big Ditch” without further incident. However, we found out we cracked at least one starboard ballast tank, because we started developing a starboard list. Every couple hours we had to do a LP blow to keep us level on the surface. We reached the Atlantic/Caribbean Locks and completed the canal transit without further incident. As we completed the transit, we discussed hitting the lock wall. We decided it was a good thing we hit the canal lock broadside. If we had hit the forward lock gate, we would have probably shattered the dome. That would have been a miserable transit. As it was SUB LANT made us a LID boat on the transit home.
Homeward Bound
I think while transiting the canal, we found out we had to stop in Norfolk to pick up an ORSE Team. Naturally. Thou shalt never miss a scheduled ORSE inspection. Just what we need on the way home. Wonderful.
In the Caribbean, we crossed our original southern track to “Tie the knot”. Completing the loop, circumnavigating the South American continent. We were the first Nuc submarine to do that.
CO had bought a saddle for his daughter in Argentina. She was an accomplished equestrian. Before Norfolk, he brings it down to the torpedo room and asks the TMOW if he has a place it can be stowed. Translation, put it in a tube until we get to New London. Crew silently gets the word, if you want something to get past customs, bring it to the TMOW. You just can’t get to it until after the third day in. TMOW puts a blanket in the tube, puts the stuff on it, shuts and locks the inner door and hangs a sign on the tube “War Shot Loaded”. Then tagged out the tube. (wouldn’t want to accidentally shoot a water slug!).
We enter Chesapeake Bay, cross the Bay Bridge Tunnel, heading toward Norfolk. Pick up the ORSE Team and head back out to the Atlantic and on to New London. I don’t remember the ORSE, so it must have been uneventful and we did OK. Nobody got fired. Got home the week before Thanksgiving and took a couple of weeks off. So ends UNITAS 76.





Leave a Reply